This a small selection of Photos that were taken at SNOLAB, at Queen’s and at Université de Montreal during the installation process of the current Picasso setup.
Picasso Photos
Our steel frame - finally assembled (Jan 2006)
Temperature and pressure control systems (TPCS)
The first TPCS underground
Heater electrical connections on top of frame
Cable Tray
The entire frame with neutron shield
Inside of heater power supply
National Instruments FieldPoint system
Heater system ready to be hooked up
DAQ rack
TPCS view at test in Montreal
Heater system front panels
First four detectors underground (sep 11, 2006)
Electronics for first system